Mitra Bath Remodeling
Menu

Bathroom remodeling
in Greater Sacramento.

  • 5-star rated on Yelp
  • Licensed & insured, CA CSLB #923631
  • 18 years in business
  • 1-year warranty in your contract
  • Free estimate, reply the same day
Get a free estimate

Get a free estimate

Free estimate from your photos and description.
We reply the same day.

How should we reply?

You entered a phone number. We only text people who agree to it, so pick one option.

Reply by text

Reply by email instead

Talk to us yourself

Call (916) 270-0777 or text us, every day, 8 am–9 pm.

Understand the investment.

Typical full remodel

$12K–$38K+

Typical time on site

1–3 weeks

Your layout, materials, fixtures, glass and existing conditions affect the estimate.

  1. Send a request or call. We reply the same day.
  2. Get a free estimate from your photos and description. If the project needs it, our team comes to your home to see the room.
  3. Scope, price and schedule are agreed in writing, then 1–3 weeks on site.

What a full remodel
can include.

A primary bathroom, a hall bath shared by the family and a small guest bathroom start from the same list. The priorities differ from room to room.

  • Removing the existing fixtures and finishes
  • A new shower, a bathtub or a tub-to-shower conversion
  • Vanity, countertop and storage
  • Tile for the floor, walls and wet area
  • Plumbing fixtures and, where planned, new positions
  • Shower glass, mirrors and lighting
  • Trim, accessories and a final walkthrough

Your written scope lists the exact work and materials.

Before you start.

What does a full bathroom remodel usually cost?

Our typical full bathroom remodel is $12,000 to $38,000 or more. The room, layout changes, tile, fixtures, glass and any repairs affect the estimate. This is a starting range, not a fixed quote for every room.

Do the 1–3 weeks include planning and materials?

The 1–3 weeks describe typical time on site. Planning, material selection, availability and any permits come into the wider schedule. We discuss the timing for your particular room before work starts.

What can change the estimate or schedule?

Layout changes, tile and fixtures, custom glass, material availability and the condition of the existing room can affect the work. Repairs and permit requirements need to be considered in the scope for your project.

What is the difference between a full remodel and a shower project?

A full remodel considers the bathroom as a whole: the shower or tub, vanity, flooring, fixtures and finishes. A shower project focuses on the shower area and its connection to the rest of the room. The written scope defines what your project includes.

What is included in a full bathroom remodel?

A full remodel usually covers the shower or tub, the vanity and storage, tile and flooring, plumbing fixtures, glass and the finishing details. Your written scope lists the exact work and materials for your room, including anything you decide to keep.

Make the next step
a conversation.

Share your city, the changes you want and your priorities. A photo is helpful, not required.

(916) 270-0777

Calls welcome every day, 8 am–9 pm

Get my free estimate
Call Request an estimate